Full name Arena Varna
Location Varna, Bulgaria
Coordinates 43°13′16″N 27°56′35″E / 43.22111°N 27.94306°E / 43.22111; 27.94306
Owner Chimimport AD (65%)
Varna Municipality (35%)
Operator Sports Complex Varna AD
Capacity 22,000
Field size 105 × 68
Surface Grass
Construction
Broke ground September 12, 2008
Built 2018 (planned)
Opened 2019 (planned)
Construction cost 35 million
Architect Gerkan, Marg and Partners, Proin Plus AD
Structural engineer Schlaich Bergermann & Partner, Tanyu Dimitrov & Partners AD
General contractor Planex Holding OOD, Tehnoimporteksport AD
Tenants
PFC Cherno More Varna (2019-)

Arena Varna (Bulgarian: Арена Варна) is a new multi-purpose all-seater stadium currently under construction in Varna, Bulgaria, which is going to be built directly, just rotated to lie on the north-south axis, in the place of the former Yuri Gagarin Stadium. Once finished, the stadium will be used mostly for football matches and will also be the new home ground of the local Cherno More Varna. The venue will have a capacity of 22,000 spectators.

It was due to open in 2013 and would have a capacity of 30,000 spectators with a possible expansion to 40,000. The stadium, as part of Sport Complex Varna, will have an underground parking area, convertible roof covers, office lounges, two-tier stands and four 50-metre (160 ft) towers, which will block the pressure of the terrain and bring the stadium in a shape of a ship. The convertible roof covers would be made of transparent panels, which would allow the light of the floodlights to stream inside the pitch during night matches. The venue would be awarded with an elite stadium rating by UEFA.

The sport complex and its concept were designed by the German architectural company GMP International GmbH, which built several stadiums for the 2006 FIFA World Cup, including the renovation of the Olympiastadion in Berlin and the construction of the Commerzbank-Arena in Frankfurt respectively. The stadium was also proposed to support a possible bid as a venue for the Euro 2020, which Bulgaria and Romania were planning to host. The construction officially started on September 12, 2008, with the demolishing of the former Yuri Gagarin Stadium.

In the follow-up years, the initial project by GMP International GmbH was partially redesigned due to the financial crisis in 2009 that affected the stadium's construction. As a result, the capacity of the stadium was reduced to 22,000 spectators, the transparent roof covers were replaced and the roof towers were removed from the original design.


...