*** Welcome to piglix ***

Neath railway station

Neath National Rail
Welsh: Castell-nedd
Castell Nedd - Arriva 153367+143002.JPG
Location
Place Neath
Local authority Neath Port Talbot
Grid reference SS751974
Operations
Station code NTH
Managed by Arriva Trains Wales
Number of platforms 2
DfT category D
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2011/12 Decrease 0.810 million
2012/13 Decrease 0.806 million
2013/14 Increase 0.820 million
2014/15 Increase 0.835 million
2015/16 Increase 0.837 million
National RailUK railway stations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Neath from Office of Rail and Road statistics. Methodology may vary year on year.
170433 at Edinburgh Waverley.JPG

Neath railway station is a mainline railway station, serving Neath, Wales. Operated by Arriva Trains Wales the station is located at street level on Windsor Road, situated back from the street fronting a small car park. It is also accessible via Milland road car park.

The surviving Neath railway station is one of four railway stations originally in Neath, and to distinguish it from the others was at one time named Neath General, the suffix being applied before Nationalisation.Neath Canalside served the Rhondda and Swansea Bay Railway services until they ended in 1963. Neath Riverside (also at times known as Neath Bridge Street and Neath Low Level), served trains to and from Brecon via the Neath and Brecon Railway, with an additional stop at Neath Abbey. The railway itself remains partly in use, linking Onllwyn and the docks. The remains of the Neath Bridge Street station can be seen by looking down at the railway alongside the river bridge just before Neath railway station in the Swansea direction.

Neath General also acted as the western passenger terminus of the Vale of Neath Railway for most of its life - trains running from here to Pontypool Road via Aberdare and Crumlin High Level via a connecting curve at the west end of the station. These ceased in June 1964 (when the line fell victim to the Beeching Axe) and the link line was lifted, though parts of the old VoNR remains intact (but disused) as far as Resolven and from Aberdare to Hirwaun.

The present station buildings date from 1974, when the old GWR structures dating from 1886/7 were demolished & rebuilt in contemporary style by British Rail.


...
Wikipedia

...