*** Welcome to piglix ***

National Port Authority

National Port Authority of the Republic of Liberia
Abbreviation NPA
Formation 1921
Type Port district
Headquarters Freeport of Monrovia
Bushrod Island, Monrovia
Region served
Liberia
Managing Director
David Williams
Website Official Website


On March 2010, the Freeport of Monrovia became ISPS Compliant (with no conditions) and moved from Security Level 2 to Security Level 1 in July 2010. The Freeport of Monrovia awarded Operations Contract to APM Terminal to handle port operations, which includes container handling, cargo handling, and marine.

As of 2011, a One-Stop Shop has been established at the Port to make it expedite Shipping and Clearing Procedures. Ministry of Finance, Ministry of Commerce, and Central Bank have set up sub stations at the Port to expedite the process.

An act of Legislature established the National Port Authority in 1967 (amended in 1970) as a state-owned enterprise to manage, plan and develop all ports in Liberia. The Authority manages four ports, namely, the Freeport of Monrovia, the Port of Buchanan, the Port of Greenville and the Port of Harper.

The Freeport of Monrovia is the largest in the Authority's Network. The United States Military built the port during World War II for strategic purposes. It handles most of the country's imported cargoes. Two breakwaters, 2,359m and 2,200m long, protect the harbour, enclosing a basin of 300 hectares of protected water. The general cargo berth, (the main pier), consists of an opened piled, 610m long by 11m wide marginal wharf with a reinforced concrete deck. The main wharf serves 2nd and 3rd generation coastal and mainline vessel.

The Port of Buchanan is located 170miles South-east of Monrovia. The Liberia-American Swedish Company (LAMCO), a joint venture company, constructed the port in 1960 for the export of iron ore deposits of the Nimba Range. Two break waters, 1,890m and 590m long to protect the harbour. Inside the basin, a 225m long ore-loading quay is located to the deeper section of the harbour basin with a water depth of 12.95m below chart datum. Adjacent to the loading quay, a waiting berth for ore carrier is available. On the inner side of the secondary breakwater, a commercial quay 334m long is located with an available water depth of 10.15m below chart datum. The access channel to the port provides ship a water depth of 14.95m below chart datum and a channel width between the breakwaters of 210m.


...
Wikipedia

...