*** Welcome to piglix ***

Mt. Lebanon (PAT station)

Mt. Lebanon
Pittsburgh Light Rail station
Pittsburgh Light Rail - Mt. Lebanon station from Shady Drive East.jpg
Mt. Lebanon station in 2016, looking north from Shady Drive East
Location Shady Drive East and Alfred Road
Mt. Lebanon, Pennsylvania
Coordinates 40°23′00″N 80°02′38″W / 40.383212°N 80.043876°W / 40.383212; -80.043876Coordinates: 40°23′00″N 80°02′38″W / 40.383212°N 80.043876°W / 40.383212; -80.043876
Owned by Port Authority
Line(s)
Platforms 1 island platform
Tracks 2
Connections Port Authority bus routes 38, 41 and 42
Construction
Parking 24 spaces
Disabled access Yes
History
Opened 1987
Services
Preceding station   Pittsburgh Light Rail (logo).svg The "T"   Following station
toward Allegheny
Red Line – Castle Shannon
Red Line – South Hills Village
Location
Mt. Lebanon (PAT station) is located in Pittsburgh
Mt. Lebanon (PAT station)

Mt. Lebanon is a station on the Red Line of the Port Authority of Allegheny County's light rail system, serving Mt. Lebanon, Pennsylvania. Opened in 1987, as of 2005 it serves an average of up to 2,000 passengers a day through both rail and bus connections.

Prior to the construction of the Pittsburgh Light Rail system, the area around the present-day Mt. Lebanon station was served by the Clearview Loop station, located a short distance from the present-day station on Alfred Road on a balloon loop that served as the terminus for the 38 Mt. Lebanon trolley service operated by Pittsburgh Railways. On May 26, 1963, the 38 Mt. Lebanon was replaced by the 42/38 Mt. Lebanon via Beechview service which extended the previous 42 Dormont trolley service to Mt. Lebanon from Dormont Junction.

Planning for the present-day Mt. Lebanon station began in 1979, alongside planning for the Mt. Lebanon Tunnel. As construction of the tunnel progressed, Clearview Loop services were terminated on April 15, 1984, with the loop and the trolley tracks on Washington Road subsequently removed and affected routes replaced by corresponding bus service. To celebrate the closing of the station and the impending opening of the new light rail system, a "Trolley Day" was held on Washington Road the night before to commemorate the over eighty years of trolley service to and from Mt. Lebanon.

The station was scheduled to be opened on Thanksgiving Day, November 28, 1984, but completion of the station was delayed owing to delays in the release of federal subsidies, compounded by construction problems. Service ultimately began on May 22, 1987, completing Pittsburgh's first modern light rail line.

The station's air rights were later sold to the municipal government of Mt. Lebanon on November 20, 1987 for $485,000 to allow for commercial development on the stretch of Washington Road immediately above the station, including direct station access to Washington Road, office and residential housing units, and the construction of a new 500-slot municipal-owned parking garage, replacing an existing parking garage that was built in the 1950s. Construction of the parking garage was not without controversy, with the original proposal being shelved in 1989 due to a lack of financing, a reduced 350-slot garage being shelved in 1991, and an even smaller garage, with room for 262 cars and a direct connection to the station, ultimately being opened in February 1994.


...
Wikipedia

...