*** Welcome to piglix ***

Motorways in Hungary


According to the Állami Autópályakezelő Zrt. ("State Motorway Management Plc."), the total length of the Hungarian motorway system was 1,400.6 kilometers in 2013. The construction of the Hungarian motorway system started in 1964 with M7, which finished in 1975 between Budapest and the Lake Balaton. The total length of the system reached 200 km in 1980, 500 km in 1998 and 1000 km in 2007.

The motorways in Hungary, Hungarian: autópálya (abbr. M), are defined as two-lane motorways in each direction, with an emergency lane. The speed limit is 130 km/h or 80 mph.

The expressways in Hungary, Hungarian: autóút, are defined as two-lane motorways in each direction. The speed limit is 110 km/h or 70 mph. Their highway shields are white on blue and road signs are white on blue, as well.

As of 1 January 2016, the Hungarian motorway network comprises 13 motorways, 13 expressways, some fast road (R). Nowadays, 21 of them are at least partially operational, but only 9 (M1, M5, M7, M15, M19, M31, M43, M51 and M70) have been completed by the end of 2016.

The motorways in Hungary, Hungarian: autópálya (abbr. M), are defined as two-lane motorways in each direction, with emergency lane. The speed limit is 130 km/h or 80 mph. Their road signs are white on blue.

The expressways in Hungary, Hungarian: autóút (abbr. M as well) are defined as dual carriageways with lower standards than that of a motorway, but with the same restrictions. The speed limit is 110 km/h or 70 mph. Their road signs are white on blue.

The fast roads in Hungary, Hungarian: gyorsút (abbr. R) are defined as dual carriageways with lower standards than that of a expressway, but the level intersection (eg, traffic light node, roundabout) is permissible. The speed limit is also 110 km/h or 70 mph.

The e-vignette user charge system applies to motorcycles, passenger cars and their trailers, as well as cargo vehicles with a maximum permissible gross weight of 3.5 tonnes, campers and buses, and their trailers. These vehicles are authorized to use the Hungarian toll speedway network’s roads exclusively with pre-purchased –purchased prior to entering a toll speedway section– road use authorization, i.e. e-vignettes. The amount of toll charges depends on the category of the vehicle and the type of thee-vignette. The category of the motorvehicles must be determined according to the official entry that appears in the vehicle registration certificate, based on the maximum permissible grossweight of the motor vehicle and the number of persons it is allowed to transport.


...
Wikipedia

...