Młociny
|
|||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Coordinates | 52°17′28″N 20°55′44″E / 52.2911°N 20.9289°ECoordinates: 52°17′28″N 20°55′44″E / 52.2911°N 20.9289°E | ||||||||||
Owned by | ZTM Warszawa | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Connections |
101, 103, 114, 156, 184, 409, 511, 701, 708, 712, 800 E-8 N01, N02, N41, N44, N46, N56, N58 2, 6, 22, 24, 26, 28, 33, 35, 71 |
||||||||||
Construction | |||||||||||
Depth | 7,3 m | ||||||||||
Platform levels | 1 | ||||||||||
Parking | 2 park-and-ride car parks | ||||||||||
Other information | |||||||||||
Station code | A23 | ||||||||||
Fare zone | 1 | ||||||||||
History | |||||||||||
Opened | 25 October 2008 | ||||||||||
Services | |||||||||||
|
Młociny is a Warsaw Metro station serving as a northern terminus to Line M1. It is situated within Warsaw administrative boundaries and ZTM ticketing zone 1, in the dzielnica of Bielany, in a close proximity to Warsaw's ArcelorMittal steelworks. The station opened on 25 October 2008 and is the final northern extension of Line M1.
The area beyond the station has been remodelled into a major public transportation junction after Młociny opened. It is served by trams and both urban and suburban buses. Although there are no plans to extend Line M1 further, the station is built in such way that it will be possible to do so if need be.
The trains are turned back at sidings behind Młociny. Terminating trains arrive at eastern side platform, whereas southbound trains depart from western side platform.