*** Welcome to piglix ***

Midland Main Line

Midland Main Line
43055 Claycross.jpg
Overview
Type Intercity, commuter rail,
regional rail and heavy rail
System National Rail
Status Operational
Locale Greater London
East of England
East Midlands
Yorkshire and the Humber
Termini London St. Pancras International
Sheffield or Nottingham
Stations 35 (London to Sheffield)
Operation
Opened Stages between 1830s–1860s
Owner Network Rail
Operator(s) East Midlands Trains
CrossCountry
Thameslink
TransPennine Express
Northern
GB Railfreight
Freightliner
DB Schenker
Direct Rail Services
Depot(s) Cricklewood
Derby Etches Park
Nottingham Eastcroft
Toton
Sheffield Station
Neville Hill
Rolling stock Class 43 HST
Class 150 Sprinter
Class 153 Super Sprinter
Class 156 Super Sprinter
Class 158 Express Sprinter
Class 170 Turbostar
Class 185 Desiro
Class 220 Voyager
Class 221 Super Voyager
Class 222 Meridian
Class 319
Class 377 Electrostar
Class 700 Desiro City
Technical
Number of tracks 2–4
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Loading gauge W6-W8, planned upgrade to UIC GB+
Electrification Mk3b 25 kV 50 Hz AC (south of Bedford)
Operating speed Maximum 125 mph (201 km/h)

The Midland Main Line is a major railway line in England from London to Sheffield in the North of England. The line is under the Network Rail description of Route 19; it comprises the lines from London's St. Pancras station via Leicester, Derby/Nottingham and Chesterfield in the East Midlands.

Express passenger services on the line are operated by East Midlands Trains. The section between St Pancras and Bedford is electrified and forms the northern half of Thameslink (mainly operated by Thameslink and Great Northern), with a fast service to Brighton and other suburban services.

A northern part of the route, between Derby and Chesterfield, also forms part of the Cross Country Route operated by CrossCountry. Tracks from Nottingham to Leeds via Barnsley and Sheffield are shared with Northern. East Midlands Local also operates regional and local services using parts of the line.

The Midland Main Line was built in stages between the 1830s and the 1870s. The earliest section was opened by the Midland Counties Railway between Nottingham and Derby on 4 June 1839. On 5 May 1840 the section of the route from Trent Junction to Leicester was opened.


...
Wikipedia

...