*** Welcome to piglix ***

Matugga-Kapeeka Road

Matugga–Kapeeka Road
Route information
Length: 26 mi (42 km)
History: Designated in 2008
Completion in 2010
Major junctions
South end: Matugga
  Semuto
North end: Kapeeka

Matugga–Kapeeka Road is a road in central Uganda, connecting the towns of Matugga in Wakiso District and Kapeeka in Nakaseke District.

The road goes through Gombe in Wakiso District and Kirolo and Semuto in Nakaseke District, a distance of approximately 42 kilometres (26 mi). The coordinates of the road near Semuto are 0°37'33.0"N, 32°19'13.0"E (Latitude:0.625833; Longitude:32.320278).

Prior to 2009, the road had a gravel surface. In 2008, the government of Uganda began to upgrade the road from gravel to bitumen at an estimated cost of US$20 million. 65 percent of the funding was provided by the government while 35 percent was provided by the Nordic Development Fund. The work was carried out by the Chongqing International Construction Corporation.COWI A/S, a Danish consultancy firm, supervised the work. Construction was completed in the second half of 2010. It was reported in October 2010 that completion would occur as planned, in December 2010.

Coordinates: 00°37′33″N 32°19′13″E / 0.62583°N 32.32028°E / 0.62583; 32.32028


...
Wikipedia

...