M5000 at Exchange Quay tram stop in August 2011
|
|
Schematic map of Metrolink.
|
|
Overview | |
---|---|
Owner | Transport for Greater Manchester |
Locale | Greater Manchester |
Transit type | Tram/Light rail |
Number of lines | 7 |
Number of stations | 93 |
Annual ridership | 34.3 million (2015/16) |
Chief executive | Danny Vaughan (TfGM's Metrolink Director) Chris Coleman (RATP's Managing Director) |
Headquarters | Trafford Depot Warwick Road South Old Trafford |
Website | www.metrolink.co.uk |
Operation | |
Began operation | 6 April 1992 |
Operator(s) | RATP Group |
Number of vehicles | 120 M5000s |
Train length | 28.4 metres (93 ft) |
Technical | |
System length | 57 miles (92 km) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Minimum radius of curvature | 25 m (82 ft) |
Electrification | Overhead line (750 V DC) |
Top speed | 50 miles per hour (80 km/h) |