*** Welcome to piglix ***

METRORail Red Line

Red Line
HoustonMetroRedLine.svg
METRO Light Rail3.jpg
Overview
Type Light rail
System METRORail
Locale Houston, Texas
Termini Northline Transit Center Station (north)
Fannin South (south)
Stations 25
Operation
Opened January 1, 2004
Expanded on December 21, 2013
Operator(s) METRO
Technical
Line length 12.8 mi (20.6 km)
Track gauge 4 ft 8 12 in (1,435 mm)
Electrification overhead cantenary
Highest elevation At grade before Hogan St. and at UH–Downtown, and again before Salem and after Bennington; elevated rail between both pairs of landmarks
Route map