*** Welcome to piglix ***

Lumding-Dibrugarh section

Lumding–Dibrugarh section
Overview
Status Operational
Locale Assam
Termini Lumding
Dibrugarh
Operation
Opened 1903
Owner Indian Railway
Operator(s) Northeast Frontier Railway
Technical
Line length 376 km (234 mi)
Number of tracks 1
Track gauge 1,676 mm (5 ft 6 in) broad gauge
Electrification Not electrified / diesel operated