Ludington Pumped Storage Power Plant

Ludington Pumped Storage Plant
GENERATING STATION OF CONSUMER POWER PLANT IN LUDINGTON - NARA - 547129 -- color graded.tif
Generators of the power plant
Country United States
Location Ludington, Michigan
Coordinates 43°53′37″N 86°26′43″W / 43.89361°N 86.44528°W / 43.89361; -86.44528Coordinates: 43°53′37″N 86°26′43″W / 43.89361°N 86.44528°W / 43.89361; -86.44528
Status Operational
Construction began 1969
Commission date 1973
Owner(s) Consumers Energy
Detroit Edison
Pumped-storage power station
Upper res. capacity 27 billion US gallons (100 Gl)
6
Lower reservoir Lake Michigan
Hydraulic head 363 feet (111 m)
Pump-generators 6
Power generation
Nameplate capacity 1,872 MW

The Ludington Pumped Storage Plant is a hydroelectric plant and reservoir in Ludington, Michigan. It was built between 1969 and 1973 at a cost of $315 million and is owned jointly by Consumers Energy and Detroit Edison and operated by Consumers Energy. At the time of its construction, it was the largest pumped storage hydroelectric facility in the world.

It consists of a reservoir 110 feet (34 m) deep, 2.5 miles (4.0 km) long, and one mile (1.6 km) wide which holds 27 billion US gallons (100 Gl) of water. The 1.3-square-mile (3.4 km2) reservoir is located on the banks of Lake Michigan. Because impervious bedrock is more than 800 feet (240 m) below the reservoir, the builders had to line the reservoir with a layer of asphalt and clay to prevent water seeping into the ground.

The power plant consists of six reversible turbines that can each generate 312 megawatts of electricity for a total output of 1,872 megawatts. Water is delivered from the upper reservoir to the turbines by six each 1,100 feet (340 m) long that taper from 28 to 24 feet (8.5 to 7.3 m) in diameter.

At night, during low demand for electricity, the turbines run in reverse to pump water 363 feet (111 m) uphill from Lake Michigan into the reservoir. The plant takes advantage of the natural steep sand dune landform of eastern Lake Michigan. During periods of peak demand water is released to generate power. Electrical generation can begin within two minutes with peak electric output of 1872 MW achieved in under 30 minutes. Maximum water flow is over 33 million US gallons (120,000 m3) per minute.

This process was designed to level the load of nearby nuclear power plants on the grid. It also replaces the need to build natural gas peak power plants used only during high demand. The Ludington Pumped Storage plant is connected to six 345-kV Transmission lines, all owned and maintained by METC, a subsidiary of ITC Holdings.

The project was given the 1973 award for "Outstanding Civil Engineering Achievement" by the American Society of Civil Engineers.

Consumers Energy discussed plans in 2008 to extend the life of the facility and upgrade the pumps to increase efficiency by up to 9%. Consumers Energy also planned to tap the wind power resources along the eastern Lake Michigan shore with wind farms. Because wind is an intermittent power source and may inconveniently deliver large amounts of power during periods of low electric demand, pumped storage facilities are desirable to have on the same grid with large-scale wind farms. The available pumped storage capacity, along with the wind characteristics, partly determine the maximum contribution wind power can make to the overall electricity use in a region.


...