*** Welcome to piglix ***

Line 2 (Shenzhen Metro)

Line 2
 2 
Shenzhen Metro Shekou Line.jpg
Interior of CRRC Changchun train
Overview
Other name(s) Shekou line
(蛇口线; 蛇口線; Shékǒu xiàn; Se4 Hau2 Sin3)
Type Rapid transit
System Shenzhen Metro
Status Operational
Locale Shenzhen, China
Termini Chiwan
Xinxiu
Stations 29
Services 1
Daily ridership 247,500
Operation
Opened 28 December 2010
Operator(s) SZMC (Shenzhen Metro Group)
Character Underground
Depot(s)

Shekou West Depot

Houhai Stabling Yard
Technical
Line length 35.78 km (22.23 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Overhead lines (1500 volts)
Operating speed 80 km/h (50 mph)
Route map
 5  to Huangbeiling
Shekou West Depot
Chiwan
 5 
 12  to Zuopaotai
Shekou Port
Sea World
 12 
 12  to Haishangtianyuan East
Shuiwan
Dongjiaotou
Wanxia
Houhai Stabling Yard
Haiyue
Dengliang
 13  to Shenzhen Bay Checkpoint
Houhai
 11   13 
 11 
Left arrow to Futian
to Bitou Right arrow
Wikipedia

...