Line 1 (Etxebarri – Plentzia) | |||
---|---|---|---|
Schematic drawing of Line 1.
|
|||
Overview | |||
Locale | Etxebarri, Bilbao, Erandio, Leioa, Getxo, Berango, Sopelana, Urduliz and Plentzia | ||
Stations | 28 | ||
Operation | |||
Opened | November 11, 1995 | ||
Operator(s) | Metro Bilbao S.A. | ||
Technical | |||
Line length | 31 km (19 mi) | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||
|