*** Welcome to piglix ***

Krustpils – Rēzekne II Railway

Krustpils–Rēzekne II Railway
Overview
Termini Krustpils Station
Rēzekne II Station
Operation
Opened 1901
Operator(s) Latvian Railways
Technical
Line length 95 km (59.03 mi)
Track gauge 1,524 mm (5 ft)

The Krustpils–Rēzekne II Railway is a 95 kilometres (59 mi) long,1,524 mm (5 ft) gauge railway built in the 20th century to connect Krustpils and Rēzekne as part of the international Ventspils–Moscow Railway.



...
Wikipedia

...