*** Welcome to piglix ***

Joondalup Line

Joondalup railway line
Overview
Termini Elizabeth Quay
Butler
Stations 13
Ridership 17.1 million (year to June 2015)
Operation
Opened 20 December 1992
Owner Public Transport Authority
Operator(s) Transperth
Technical
Line length 40.7 km (25.3 mi)
Track gauge 1,067 mm (3 ft 6 in)
Electrification Overhead 25 kv AC
Route map
Butler railway line
Continues to Mandurah line
Elizabeth Quay
000.0km Perth Underground
William Street Tunnel
Roe Street Tunnel
Fremantle line
Graham Farmer Freeway
(Hamilton Interchange)
Neutral Section
Loftus St/Thomas St
003.2km Leederville
Lake Monger Dr/Vincent St
Neutral Section
Hillman Substation
Powis Street
005.4km Glendalough
Scarborough Beach Road
Hutton Street
009.0km Stirling
Cedric Street
Karrinyup Road
Erindale Road
Reid Highway
Beach Road
014.5km Warwick
Warwick Road
Wikipedia

...