*** Welcome to piglix ***

Jackup barge


A jackup rig or a self-elevating unit is a type of mobile platform that consists of a buoyant hull fitted with a number of movable legs, capable of raising its hull over the surface of the sea. The buoyant hull enables transportation of the unit and all attached machinery to a desired location. Once on location the hull is raised to the required elevation above the sea surface supported by the sea bed. The legs of such units may be designed to penetrate the sea bed, may be fitted with enlarged sections or footings, or may be attached to a bottom mat. Generally jackup rigs are not self-propelled and rely on tugs or heavy lift ships for transportation.

Jackup platforms are used as exploratory drilling platforms and offshore and wind farm service platforms. Jackup platforms have been the most popular and numerous of various mobile types in existence. The total number of jackup 'Drilling' rigs in operation numbers about 540 at the end of 2013. The first one was designed by R. G. LeTourneau for Zapata Oil, owned by George H. W. Bush, who later became the 41st President of the United States.

Jackup rigs are so named because they are self-elevating with three, four, six and even eight movable legs that can be extended (“jacked”) above or below the hull. Jackups are towed or under self propulsion moving to the site with the hull lowered to the water level, and the legs extended above the hull. The hull is actually a water-tight barge that floats on the water’s surface. When the rig reaches the work site, the crew jacks the legs downward through the water and into the sea floor (or onto the sea floor with mat supported jackups). This anchors the rig and holds the hull well above the waves.

A jackup rig is a floating barge fitted with long support legs that can be raised or lowered. The jackup is maneuvered (self-propelled or by towing) into location with its legs up and the hull floating on the water. Upon arrival at the work location, the legs are jacked down onto the seafloor. Then "preloading" takes place, where the weight of the barge and additional ballast water are used to drive the legs securely into the seabottom so they will not penetrate further while operations are carried out. After preloading, the jacking system is used to raise the entire barge above the water to a predetermined height or "air gap", so that wave, tidal and current loading acts only on the relatively slender legs and not on the barge hull.


...
Wikipedia

...