INS Saryu
|
|
History | |
---|---|
India | |
Name: | INS Saryu |
Operator: | Indian Navy |
Builder: | Goa Shipyard Limited |
Cost: | ₹6.2 billion (US$96 million) |
Launched: | 30 March 2009 |
Completed: | 21 December 2012 |
Commissioned: | 21 January 2013 |
Identification: | Pennant number: P54 |
Status: | in active service |
General characteristics | |
Class and type: | Saryu class patrol vessel |
Tonnage: | 2,300 tonnes (2,300 long tons; 2,500 short tons) |
Length: | 105 m (344 ft) |
Beam: | 12.9 m (42 ft) |
Height: | 3.6 m (12 ft) |
Installed power: | 2 x 7790 kW engines |
Propulsion: | Two SEMT Pielstick diesel engines |
Speed: | 25 knots (46 km/h; 29 mph) |
Range: | 6,000 kilometres (3,700 mi) at 16 knots (30 km/h; 18 mph) |
Endurance: | Two months |
Complement: | Eight officers and 105 sailors |
Armament: |
|
Aircraft carried: | 1x HAL Dhruv or 1x HAL Chetak |
INS Saryu is the first Saryu-class patrol vessel of the Indian Navy, designed and constructed indigenously by the Goa Shipyard Limited. The ship is home-ported at Port Blair, under the Andaman and Nicobar Command (ANC). She is the largest offshore patrol vessel in the navy.
The Saryu-class patrol vessels were ordered for the navy by the Ministry of Defence in December 2008, for performing coastal patrol.Goa Shipyard Limited (GSL) became the first Indian shipyard to have designed and constructed this class of warship completely indigenously.
Saryu is the most advanced vessel to be constructed by GSL in terms of design, performance and quality. The ship has been designed by an in-house team and was built at the cost of ₹6.2 billion (US$96 million). Construction of the vessel took three and a half years, and was delayed due to late supply of gearboxes by the Indian supplier. A new order for the gearboxes was then placed with another manufacturer, which delivered them in early December 2011. Saryu was then completed by November 2012. Three more vessels of the class are being constructed for the navy, and all will be delivered by 18 months (from the commissioning of Saryu), each at an interval of six months.
INS Saryu was launched on 30 March 2009 by the Chief of Naval Staff, Admiral Sureesh Mehta. The navy took delivery of the ship on 21 December 2012 and she was commissioned on 21 January 2013 at Vasco da Gama, by the Commander-in-Chief of the Andaman and Nicobar Command (ANC), Air Marshal P.K. Roy.
The ship has a range of 6,000 kilometres (3,200 nmi), and can remain deployed at sea for two months without replenishment. She is crewed by eight officers and 105 sailors. She is armed with an Italian-made OTO Melara 76-millimetre (3.0 in) gun; two Russian-made AK-630 six-barrelled 30-millimetre (1.2 in) close-in weapon systems (CIWS), and six self-protection chaff launchers, all of which are controlled by an on-board electro-optic fire-control system. She also has navigational and early warning radars, and an integrated electronic warfare system. She carries two rigid inflatable fast-motor boats alongside a multi-role helicopter like the HAL Dhruv or HAL Chetak.