In February 2009, the government of Portugal announced plans to build a high-speed rail line from Lisbon to Madrid; this plan was cancelled in March 2012. The project was valued at €7.8 billion and the government had claimed it would create 100,000 jobs. The line would link to Spain's Southwest Corridor.
Since the late 1990s Comboios de Portugal (CP) has run the Alfa Pendular service, connecting Portugal's mainland from the north border to the Algarve at a speed of up to 220 kilometres per hour (140 mph) (in specific sections), although this reduces the travel time between Porto and Lisbon by only approximately 30 minutes.
The service is operated using 10 Italian-designed Pendolino tilting trains. Based on the Italian ETR 480, trains were assembled in Portugal at the former SOREFAME/Adtranz plant in Amadora. Fiat Ferroviaria was the main contractor, with Siemens AG and ADtranz as subcontractors.
In addition to these high-speed trains, CP InterCity "corail" coaches have been upgraded to 200 kilometres per hour (120 mph) running. These are hauled by CP 5600 locomotives (identical to the Spanish RENFE Class 252). These "corail" coaches are based on French SNCF Corail cars but their carbody is made out of stainless steel, manufactured at the SOREFAME plant.