Helmdon Village railway station

Helmdon Village
Location
Place Helmdon
Area South Northamptonshire
Grid reference SP588438
Operations
Original company Northampton and Banbury Junction Railway
Pre-grouping Stratford-upon-Avon and Midland Junction Railway
Post-grouping London, Midland and Scottish Railway
London Midland Region of British Railways
Platforms 2
History
1 June 1872 Opened as Helmdon
1 July 1950 Renamed Helmdon Village
2 July 1951 Closed to passengers
29 October 1951 Goods facilities withdrawn
Disused railway stations in the United Kingdom
Closed railway stations in Britain
A B C D–F G H–J K–L M–O P–R S T–V W–Z
170433 at Edinburgh Waverley.JPG

Helmdon Village railway station on the Stratford-upon-Avon and Midland Junction Railway (SMJ) served the Northamptonshire village of Helmdon between 1872 and 1951. It was one of two stations serving the lightly populated rural area, the other being Helmdon railway station on the Great Central Main Line, and its closure marked the beginning of the years of decline for the SMJ line.

In August 1871 the Northampton and Banbury Junction Railway (N&BJ) extended its line from Towcester to Helmdon. A station was erected in a shallow cutting spanned at its western end by a twin-arched road bridge carrying the village street (now known as Station Road) across the line. The station building and track layout was similar in style to that at neighbouring Wappenham: a one-storey symmetrical red brick building and a single loop siding on the Wappenham side, 100 yards (91 m) from the station, linked to the main line. Unlike Wappenham, Helmdon had a small red brick gabled goods shed which spanned the siding and contained a goods office and internal loading platform.

The station had two platforms enclosing a passing loop, but only one of these was used for regular passenger services. The other was used on race days. The loop was taken out of service with the amalgamation of the N&BJ with the Stratford-upon-Avon and Midland Junction Railway in 1910; Towcester to Cockley Brake junction became one section.

Helmdon was busiest from 1894 until 1898, when the contractor building the section of the Great Central Main Line between Woodford Halse and Brackley Central used it as a railhead to bring materials to build the nine-arch viaduct spanning the valley and carry the new line over the N&BJ's line. A temporary line was laid from Helmdon station to a construction yard with several sidings at the viaduct's planned site. The opening of the Great Central station at Helmdon created potential for confusion until 1928, when the GCR's successor the London and North Eastern Railway renamed it "Helmdon for Sulgrave". The SMJR station was closer to Helmdon village, so in 1950 British Railways renamed it "Helmdon Village".


...