Underground hard rock mining refers to various underground mining techniques used to excavate hard minerals, mainly those containing metals such as ore containing gold, silver, iron, copper, zinc, nickel, tin and lead, but also involves using the same techniques for excavating ores of gems such as diamonds. Soft rock mining refers to excavation of softer minerals such as salt, coal, or oil sands.
Accessing underground ore can be achieved via a decline (ramp), inclined vertical shaft or adit.
Declines are often started from the side of the high wall of an open cut mine when the ore body is of a payable grade sufficient to support an underground mining operation but the strip ratio has become too great to support open cast extraction methods. They are also often built and maintained as an emergency safety access from the underground workings and a means of moving large equipment to the workings.
Levels are excavated horizontally off the decline or shaft to access the ore body. Stopes are then excavated perpendicular (or near perpendicular) to the level into the ore.
There are two principal phases of underground mining: development mining and production mining.
Development mining is composed of excavation almost entirely in (non-valuable) waste rock in order to gain access to the orebody. There are six steps in development mining: remove previously blasted material (muck out round), Scaling (removing any unstable slabs of rock hanging from the roof and sidewalls to protect workers and equipment from damage), installing support or/and reinforcement using shotcrete etceteras, drill face rock, load explosives, and blast explosives. To start the mining first step is to make the path to go down. The path is defined as 'Decline' as describe above. Before the start of Decline all preplanning of Power facility, drilling arrangement, dewatering, ventilation and, muck withdrawal facilities are required.