Ambush on sea trials, December 2012.
|
|
History | |
---|---|
![]() |
|
Name: | HMS Ambush |
Namesake: | Ambush |
Ordered: | March 1997 |
Builder: | BAE Systems Submarine Solutions |
Laid down: | 22 October 2003 |
Launched: | 6 January 2011 |
Christened: | 16 December 2010 |
Commissioned: | 1 March 2013 |
Homeport: | HM Naval Base Clyde |
Identification: | Pennant number: S120 |
Motto: | Hide And Seek |
Status: | Commissioned, on sea trials |
Badge: | ![]() |
General characteristics | |
Class and type: | Astute-class fleet submarine |
Displacement: |
|
Length: | 97 m (318 ft 3 in) |
Beam: | 11.3 m (37 ft 1 in) |
Draught: | 10 m (32 ft 10 in) |
Propulsion: | Rolls-Royce PWR 2 reactor, MTU 600 kilowatt diesel generators |
Speed: | 30 kn (56 km/h; 35 mph), submerged |
Range: | Unlimited |
Endurance: | 90 days |
Test depth: | Over 300 m (984 ft 3 in) |
Complement: | 98 (capacity for 109) |
Sensors and processing systems: |
|
Armament: |
|
HMS Ambush is an Astute-class nuclear fleet submarine of the Royal Navy, the second boat of her class. Ambush is the third vessel, and the second submarine, to bear the name in Royal Naval service. She was ordered in 1997, laid down in 2003 and commissioned in 2013.
Ambush's nuclear reactor will not need to be refuelled during the boat's 25-year service. Since the submarine can purify water and air, she will be able to circumnavigate the planet without resurfacing. The main limit is that the submarine will only be able to carry three months' supply of food for 98 officers and ratings.
Ambush has provision for up-to 38 weapons in six 21-inch (533 mm) torpedo tubes. The submarine is capable of using Tomahawk Block IV land-attack missiles with a range of 1,000 miles (1,600 kilometres) and Spearfish heavyweight torpedoes.
Ambush was ordered from GEC's Marconi Marine (now BAE Systems Submarine Solutions) on 17 March 1997. She was laid down at Barrow-in-Furness on 22 October 2003, officially named on 16 December 2010, launched on 6 January 2011, completed her initial dive test on 30 September 2011, and departed Barrow for sea trials on 15 September 2012.Ambush was commissioned in a ceremony at HM Naval Base Clyde on 1 March 2013.
Ambush was scheduled to conduct her maiden operations sometime in 2014. She has already conducted trials, linking up with RFA Diligence. She has also conducted torpedo and Tomahawk cruise missile tests, with early signs showing that they were successful.Ambush sailed down to Brazil in 2014 and also made a port call in Port Canaveral. In April 2015, Ambush participated in Exercise Joint Warrior, the largest military exercise held in Europe, alongside 55 other naval ships of NATO navies. She further participated in Exercise Dynamic Manta 15. In August 2015, The Sun reported that Ambush had conducted reconnaissance off the coast of Libya to locate targets for potential strikes against ISIS.