*** Welcome to piglix ***

Höllental Railway (Black Forest)

Höllentalbahn
Hell Valley Railway
Technical
Line length 74.7 km (46.4 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification 1936 until 1960, 20 kV, 50 Hz, AC
since 1960, 15 kV, 16⅔ Hz, AC
Operating speed 100 km/h
Highest elevation 607 m (1,991 ft)
Maximum incline 5.5%
Rack system 1887 until 1933; now adhesion
Route map
Verlaufskarte Höllentalbahn 2.png
Stations, junctions and heights above sea level
Rhine Valley Railway from Mannheim
−2,0 Freiburg (Breisgau) Hbf. 278 m
0 Branch point(replaced by a new route in 1934)
Rhine Valley Railway to Basel
Loretto Tunnel514 m
Sternwald Tunnel302 m
2,7 Freiburg Wiehre 280 m
5,7 Freiburg Littenweiler 317 m
7,4 Kappelertalnow closed
11,0 Kirchzarten 392 m
13,9 Himmelreich 455 m
Falkenstein Tunnel72 m
Lower Hirschsprung Tunnel121 m
Upper Hirschsprung Tunnel69 m
18,2 Hirschsprungnow closed 559 m
Kehre Tunnel203 m
20,6 Posthaldenow closed 657 m
22,2 Höllsteignow closed 740 m
Ravenna Bridge224 m
Ravenna Tunnel47 m
Finsterrank Tunnel248 m
Löffel Valley Tunnel82 m
25,4 Hinterzarten 885 m
29,3 Titisee 858 m
Dreiseenbahn to Seebrugg
32,3 Hölzlebrucknow closed
29,3 Neustadt (Schwarzwald) 805 m
39,1 Kappel Gutachbrücke ()now closed
Branch line to Bonndorf
Gutach Valley Bridge ()
Finsterbühl Tunnel166 m
Hörnle Tunnel220 m
Wikipedia

...