Gwabegar railway line, New South Wales
Gwabegar railway line |
Binnaway Station
|
Overview |
Termini |
Wallerawang
Gwabegar |
Operation |
Opened |
10 September 1923 (1923-09-10)
|
Closed |
June 2007 (2007-06)
|
Technical |
Track gauge |
4 ft 8 1⁄2 in (1,435 mm) |
Gwabegar rail line map
|
Gwabegar Line
|
Mudgee railway station
|
Line length |
431.7 km (268.2 mi) |
Track gauge |
1,435 mm (4 ft 8 1⁄2 in) |
|
|
|
171.9 |
Main Western line |
|
|
at Wallerawang |
|
|
Irondale |
|
|
Pipers Flat |
|
|
Portland |
|
|
Portland Cement Works (closed) |
|
|
Cullen Bullen |
|
|
Invincible Colliery (closed) |
|
193.7 |
Baal Bone Junction |
|
200.3 |
Baal Bone Colliery |
|
|
Ben Bullen |
|
|
Capertee Tunnel |
|
207.4 |
Capertee |
|
|
Airly Loop Junction |
|
|
Airly Loop |
|
|
Torbane |
|
|
Excelsior |
|
|
Weenga |
|
|
Carlos Gap |
|
|
Carlos Gap Tunnel |
|
|
Vulcan |
|
|
Clandulla |
|
|
Charbon |
|
|
Charbon Colliery Junction |
|
|
Charbon Colliery |
|
|
Kandos Cement Works |
|
249.3 |
Kandos |
|
257.2 |
Rylstone |
|
|
Mortonmain |
|
|
Lue |
|
|
Havilah |
|
|
Mount Knowles |
|
|
Mount Frome |
| | | |