*** Welcome to piglix ***

Gunter's Chain

Gunter's chain
Gunter's chain at Campus Martius Museum.JPG
Gunter's chain at Campus Martius Museum
Unit information
Unit system imperial/US units
Unit of length
Unit conversions
1 gunter's chain in ... ... is equal to ...
   imperial/US units    22 yd
   metric (SI) units    20.1168 m
Gunter's link
Unit system imperial/US units
Unit of length
Unit conversions
1 gunter's link in ... ... is equal to ...
   imperial/US units    1/100 Gunter's chain
 7.9200 in
   metric (SI) units    201.1680 mm

Gunter's chain or the surveyor's chain (also known as Gunter’s measurement or surveyor’s measurement) is a distance measuring device used for land survey. It was designed and introduced in 1620 by English clergyman and mathematician Edmund Gunter (1581–1626) long before the development of the theodolite and other more sophisticated equipment, enabling plots of land to be accurately surveyed and plotted, for legal and commercial purposes.

Gunter used an actual measuring chain of 100 links. These, the chain and the link, have become units of their own.

The 66-foot (~20.117 m) chain is divided into 100 links, usually marked off into groups of 10 by brass rings or tags which simplify intermediate measurement. Each link is thus 7.92 inches long.

Gunter's chain reconciled two seemingly incompatible systems: the traditional English land measurements, based on the number 4, and the newly introduced system of decimals based on the number 10. Since an acre measured 10 square chains in Gunter's system, the entire process of land measurement could be computed in decimalized chains and links, and then converted to acres by dividing the results by 10.

The method of surveying a field or other parcel of land with Gunter's chain is to first determine corners and other significant locations, and then to measure the distance between them, taking two points at a time. The surveyor is assisted by a chainman. A ranging rod (usually a prominently coloured wooden pole) is placed in the ground at the destination point. Starting at the originating point the chain is laid out towards the ranging rod, and the surveyor then directs the chainman to make the chain perfectly straight and pointing directly at the ranging rod. A pin is put in the ground at the forward end of the chain, and the chain is moved forward so that its hind end is at that point, and the chain is extended again towards the destination point. This process is called ranging, or in the US, chaining; it is repeated until the destination rod is reached, when the surveyor notes how many full lengths (chains) have been laid, and he can then directly read how many links (one-hundredth parts of the chain) are in the distance being measured.

The whole process is repeated for all the other pairs of points required, and it is a simple matter to make a scale diagram of the plot of land. The process is surprisingly accurate and requires only very low technology. Surveying with a chain is simple if the land is level and continuous—it is not physically practicable to range across large depressions or significant waterways, for example. On sloping land, the chain was to be "leveled" by raising one end as needed, so that undulations did not increase the apparent length of the side or the area of the tract.


...
Wikipedia

...