Overview | |
---|---|
Line | Dovre Line |
Location | Gulfossen, Melhus, Norway |
Coordinates | 63°07′07″N 10°14′41″E / 63.1186°N 10.2446°ECoordinates: 63°07′07″N 10°14′41″E / 63.1186°N 10.2446°E |
System | Norwegian railway |
Operation | |
Opened | 6 July 1918 |
Owner | Norwegian National Rail Administration |
Technical | |
Line length | 701 m (2,300 ft) |
No. of tracks | Single |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrified | Yes |
Gulfoss Tunnel is a 701-meter (2,300 ft) railway tunnel situated at Gulfossen in Melhus, Norway. The tunnel carries a single, electrified track of the Dovre Line. The Trondhjem–Støren Line, which opened in 1864, crossed the river Gaula on a bridge to the opposite side of the river as the current site of the tunnel. This section of track was a challenge due to regular flooding. With the 1908 decision to build the Dovre Line and gauge conversion, the Gulfossen section became one of two parts of the line to be reworked. Gulfoss Tunnel opened on 6 July 1918.
The Gulfoss Tunnel has a length of 701 meters (2,300 ft) and carries a single track of electrified, standard gauge railway. Situated on the Dovre Line, the southern end is situated 508.97 kilometers (316.26 mi) from Oslo Central Station. Immediately to the north is a 72-meter (236 ft) bridge which crosses Gaula.
The Trondhjem–Støren Line opened in 1864. At Gulfossen the line was carried across Gaula on a 188-meter (617 ft) bridge. Gaula had proved a challenge for keeping the railway running. The first major flood took place in May 1879, causing landslides along the line at several parts. Following the 1908 decision to extend the Dovre Line to Trondheim, the Norwegian State Railways decided to upgrade two sections of the Trondhjem–Støren Line along with a gauge conversion to standard gauge. In addition to part of the line north of Heimdal, this involved building a new section past Gulfossen.
The break-through of the tunnel took place on 18 June 1915, and was followed by a new and smaller bridge crossing Gaula, which was completed in early 1918. A flood hit the section of track past Gulfossen on 23 June 1918, washing away the line. NSB dispatched 300 workers to the area, including 150 army engineers. The immediately started work on laying tracks through the tunnel, allowing the new segment to be taken into use on 6 July. The tunnel was electrified on 1 November 1970.