Class overview | |
---|---|
Name: | Gregorio del Pilar class Frigate |
Builders: | Avondale Shipyards, USA |
Operators: | Philippine Navy |
In service: | 2011 to present |
Active: | 3 |
General characteristics | |
Class and type: | Gregorio del Pilar class |
Type: | Frigate |
Displacement: | 3,250 tons |
Length: | 378 ft (115 m) |
Beam: | 43 ft (13 m) |
Draft: | 8.75 ft (2.67 m) |
Propulsion: |
|
Speed: | 29 knots (54 km/h) |
Range: | 14,000 nautical miles (25,900 km) |
Endurance: | 45 Days |
Boats & landing craft carried: |
2 × RHIB |
Complement: | 80 |
Sensors and processing systems: |
|
Electronic warfare & decoys: |
2 × Mk.36 Super Rapid Blooming Offboard Countermeasures (SRBOC) Chaff and Decoy Launching System |
Armament: |
|
Aircraft carried: | 1 × AgustaWestland AW109 Power naval helicopter |
Aviation facilities: | retractable hangar and flight deck |
The Gregorio del Pilar class is a ship class of three frigates currently in service of the Philippine Navy, and are currently the foremost surface combatant of the fleet. These ships were formerly used by the US Coast Guard as Hamilton class high endurance cutters.
Early in 2011, the Philippine Navy announced the acquisition of an ex-US Coast Guard Hamilton-class high-endurance cutter under the "Ocean-going Escort Vessel" project through the US Excess Defense Article programme. The ship acquired was the former USCGC Hamilton (WHEC-715), renamed BRP Gregorio del Pilar (PF-15) which was officially turned over to the Philippine Navy on 13 May 2011 at Alameda Point in California. It was retrofitted and modified in the US, replacing systems removed by the USCG. The ship's arrival ceremonies were on 23 August 2011 in Manila, and it was commissioned on 14 December 2011.
A second Hamilton-class cutter, the USCGC Dallas (WHEC-716), was turned over to the Philippine Navy on 22 May 2012 with ceremonies held at the Federal Law Enforcement Training Center Pier Papa in North Charleston, South Carolina. The ship was named BRP Ramon Alcaraz (PF-16) in Philippine Navy service. Like its sister ship, it was retrofitted and modified in the US, replacing systems removed by the USCG. It was expected to arrive in the Philippines by February 2013. However, further training and unspecified upgrades on the ship pushed the arrival of the BRP Ramon Alcaraz to August 2013. The ship's arrival ceremony was held at Subic Harbor on August 6, 2013, led by President Aquino. It was commissioned on Nov. 22, 2013.