*** Welcome to piglix ***

FS Class E.471

FS Class E.471
E47171928.jpg
Type and origin
Power type Electric
Builder CEMSA
Build date 1928
Total produced 1
Specifications
Configuration:
 • AAR 1-D-1
 • UIC 1′D1′
Gauge 1,435 mm (4 ft 8 12 in) standard gauge
Wheel diameter 1,630 mm (64.17 in)
Length 13.5 m (44 ft 3 12 in)
Loco weight

92 tonnes

(58 tonnes adhesive)
Electric system/s

AC, 3.6 kV, 16.7 Hz or

10 kV, 45 Hz
Current pickup(s) overhead line
Traction motors 2
Performance figures
Maximum speed

75 km/h (16.7 Hz)

100 km/h (45 Hz)
Power output

1,630 kW (16.7 Hz)

3,270 kW (45 Hz)
Career
Operators FS
Type and origin
Power type Electric
Builder CEMSA
Build date 1928
Total produced 1
Specifications
Configuration:
 • AAR 1-D-1
 • UIC 1′D1′
Gauge 1,435 mm (4 ft 8 12 in) standard gauge
Wheel diameter 1,630 mm (64.17 in)
Length 13.5 m (44 ft 3 12 in)
Loco weight

92 tonnes

(58 tonnes adhesive)
Electric system/s

AC, 3.6 kV, 16.7 Hz or

10 kV, 45 Hz
Current pickup(s) overhead line
Traction motors 2
Performance figures
Maximum speed

75 km/h (16.7 Hz)

100 km/h (45 Hz)
Power output

1,630 kW (16.7 Hz)

3,270 kW (45 Hz)
Career
Operators FS

92 tonnes

AC, 3.6 kV, 16.7 Hz or

75 km/h (16.7 Hz)

1,630 kW (16.7 Hz)

The FS Class E.471 locomotives were prototype three-phase AC electric locomotives designed for the Italian State Railways (FS). They constituted the first Italian experiment in using a phase convertor. The final goal was to power them with single-phase alternating current, constituting the first case of a European locomotive of this type designed according to modern criteria. However, the difficulty of the development, and political interference, led to the abandonment of the project.

In 1928, following the experience acquired in the three-phase high-voltage (10 kV) AC operation with FS Class E.470, a new locomotive of 3,270 kilowatts (4,390 hp) was built, which was supposed to represent the ultimate development of three-phase traction. It was called E.471, and it had the same 1′D1′ wheel arrangement as E.470, but it was technically different. Designed by the famous engineer Kálmán Kandó and built in the plant of Construzioni Elettro Meccaniche di Saronno (CEMSA), it was aimed at the future development of three-phase traction. According to the research of the engineer Erminio Mascherpa () the project was not developed by the FS but autonomously by CEMSA thanks to the collaboration it had established with Kandó.

According to some oral testimonies, after management changes at the Material and Traction Service of FS due to the advent of Fascism in Italy, the project was judged "an error of the engineer Donati" and the test results were held to be unsatisfactory. Ten locomotives had been ordered but the project was terminated early and only one was actually built. On the other hand, Mascherpa provided an impressive documentation from which it seems that, at the end of the test runs, a tractive effort corresponding to that envisaged was achieved. Rather, the real reason for the termination was the hostility of the new FS leadership to the engineer Alfredo Donati (former director of the Special Electrification Unit of the General Directorate of FS) who was deported following the appointment of the extraordinary commissioner Edoardo Torre ().


...
Wikipedia

...