East Knapton is a village in the Ryedale district of North Yorkshire, England.
It is just north of the A64 near the junction with the B1258. The York to Scarborough railway line is just north of the village and runs close to the power station. From 1845 until 1930, there was a railway station. The village is in the Rillington ward of Ryedale District Council which has a combined population of 1,734. On the other side of the A64 is Knapton Wood.
The village lies in the parish of West Heslerton which has the All Saints church. This is part of the Rillington group of churches.
This power station was opened in 1995 by Amy Glover, 8 years old. It has a 42 MWe General Electric LM6000 open cycle gas turbine with a thermal efficiency of 38%. The development was the subject of a public inquiry in 1992, formal consent was given by the Department of Trade and Industry and the Department of the Environment in March 1993. In August 2006, Scottish Power sold the power station to the RGS Energy Ltd, a subsidiary of UK Energy Systems Ltd (a holding company owned by US Energy Systems of Avon, Connecticut) for £15.5 million. The plant uses about 12,000 BTU per kWh of electricity, which is inefficient to more modern CCGT plants which use about 6,500 BTU per kWh of electricity.
Natural gas was discovered in Ryedale in 1970. The gas for the power station does not come from the National Transmission System but local gas fields found in Permian limestone and carboniferous sandstone at 5,000-foot depth. The Permian reservoir gas contains small quantities of hydrogen sulphide (less than 0.1% by weight). At the Knapton site the combined gas flow from the well sites passes to a separator where liquids are removed. It then passes to a sulphur removal facility before being sent to the gas turbine. The removed liquids are sent to a liquids injection well which returns them to the underground reservoir. The Knapton site also has a ground flare to burn waste gases.