A8 motorway | ||||
---|---|---|---|---|
Autostrada A8 | ||||
East–West Motorway Autostrada Est-Vest |
||||
Route information | ||||
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România | ||||
Length: | 318.8 km (198.1 mi) (planned length) |
|||
Major junctions | ||||
From: | Târgu Mureș (junction with A3) | |||
Highway system | ||||
|
The East–West Motorway, labeled as A8 Târgu Mureș–Iași (Romanian: Autostrada Est-Vest (A8)), is a planned motorway in Romania, that will cross the Eastern Carpathians to connect the historical regions of Moldavia and Transylvania. Pre-feasibility studies performed in 2007 were followed by feasibility studies in 2009-2011. As of February 2015, the feasibility study revision and update is being conducted by private contractors.
With a total length of 318.8 kilometres (198.1 mi), and an estimated cost of 4.07 billion €, A8 will have the following route (from east to west): Ungheni - border with Moldova, Iași, Târgu Frumos, Pașcani, Târgu Neamț, Poiana Largului, Tulgheș, Ditrău, Sovata, Târgu Mureș - junction with A3 motorway.