*** Welcome to piglix ***

EMEC


The European Marine Energy Centre (EMEC) Ltd is a UKAS accredited test and research centre focusing on wave and tidal power development based in the Orkney Islands, UK. The Centre provides developers with the opportunity to test full-scale grid-connected prototype devices in unrivalled wave and tidal conditions. The operations are spread over five sites:

EMEC was established by a grouping of public sector organisations following a recommendation by the House of Commons Science and Technology Committee in 2001. The centre offers, apart from access to water with high wave and tidal energy potential, various kinds of support regarding regulatory issues, grid connection and meteorological monitoring as well as local research and engineering support.

EMEC’s wave test facility is placed on the western edge of the Orkney mainland, in an area with one of the highest wave energy potentials in Europe. The exposed North Sea location means the island group is subjected to the powerful dynamic forces of the North Atlantic Ocean. Construction of the wave test facility was completed in October 2003, and operational activities commenced shortly thereafter. The centre's facilities consist of five test berths situated along the 50m water depth contour off Billia Croo, Stromness on the Orkney mainland (some 2 km offshore) and two shallow water berths situated close to the substation.

The following have been installed:

For the most up-to-date information regarding technologies testing at EMEC, visit: EMEC tidal clients and EMEC wave clients

The tidal power test site at the Fall of Warness, to the west of the island of Eday, was chosen for its high velocity marine currents which reach almost 4 m/s (7.8 knots) at spring tides. The facility offers five test berths at depths ranging from 25 m to 50 m in an area 2 km across and approximately 4 km in length.

From each developer berth, the subsea cables follow back along the seabed and then pass under the beach and into an external housing next to the substation. An adjacent laydown area then provides an optional area for developers to use conditioning equipment for converting from the level at which they are generate to grid compliant electricity. Underground ducts then connect the cables through to the switchboard in the substation building. The substation building has four separate areas: the HV switchroom, communications room, personnel room and the standby generator room.


...
Wikipedia

...