*** Welcome to piglix ***

Duri-Tangerang railway

Duri-Tangerang railway
Overview
Other name(s) Tangerang railway
Type Commuter rail
Status Operational
Locale Jakarta; Banten
Termini Duri
Tangerang
Stations 8
Operation
Opened 1899
Owner PT Kereta Api Indonesia
Operator(s) KA Commuter Jabodetabek
Technical
Number of tracks 2
Track gauge 1,067 mm (3 ft 6 in)
Electrification 1.5 kV DC overhead line

The railway between Duri and Tangerang is a railway connecting Tangerang to Jakarta, the capital city of Indonesia. It was constructed during the Dutch colonial age, as a branch line from the Jakarta Kota-Anyer Kidul railway. The railway is serviced by KA Commuter Jabodetabek's KRL Icon Brown.svg brown line.

The public railway company Staatsspoorwegen built the line in 1899 as part of the Western railways (Dutch: Westerlijnen) in order to improve connectivity with the western regions on Java.

On 2 January 1899 the first part of the Jakarta Kota-Anyer Kidul mainline was opened between Batavia Zuid (Jakarta Kota) and Tangerang. After completing the railway in the following year, the line between Duri and Tangerang remained as a mere branch line.

The entire railway is currently electrified with 1.5 kV DC overhead lines, accommodating the electric commuter trains of KA Commuter Jabodetabek's Brown line. An additional track was added in 2012, resulting in a double track along the entire stretch between Tangerang and Duri.


...
Wikipedia

...