Dandenong Bypass

Dandenong Bypass
Victoria
Type Highway
Length 11 km (6.8 mi)
Opened 2007 & 2012
Route number(s) State Route 49
West end
 
East end
Major settlements Keysborough

The Dandenong Bypass runs along the Dingley Freeway route from Springvale Road in Springvale South to the South Gippsland Highway in Dandenong South.

The Dandenong Bypass was completed along the alignment reserved for the Dingley Freeway corridor. The project has been staged in two separate projects over seven years, and has been recently opened to traffic between Springvale Road and South Gippsland Highway in December 2012. The entire bypass has a speed limit of 80 km/h with traffic light controlled intersections and overpasses at Cheltenham Road and EastLink.

The bypass commenced construction in late 2005 between Perry Road and South Gippsland Highway as part of the EastLink project, with the $65 million works involving the creation of a four lane divided road with traffic light controlled access at roads which run north-south along the constructed route.

The 4.8 km bypass also included an overpass of the Cranbourne railway line as well as a diamond interchange with EastLink. The entire bypass has an 80 km/h speed limit. The project was completed and opened to traffic on 9 December 2007.

The Springvale Road - Perry Road section of the bypass connects Westall Road with the then open Dandenong Bypass at Perry Road, creating an arterial standard highway, with traffic light controlled intersections and an overpass at Cheltenham Road, for 11 km from Westall Road to the South Gippsland Highway.

The new section of road, which commenced construction in 2011, is expected to carry between 30,000 and 40,000 vehicles per day as well as a shared path being constructed alongside, linking to existing shared paths which already run along the built sections of the arterial. The construction of this section (at a cost of $74.6 million) was brought forward to commence in 2010 as part of the "Nation Building" initiatives in the 2009 Victorian State Budget. . The project was completed early and under budget (previously estimated to cost $80 million) to traffic on 20 December 2012.


...