*** Welcome to piglix ***

Croydon Power Station

Croydon Power Station
Croydon B Powerstation 2.jpg
Croydon A power station's cooling towers in 1973
Croydon power stations is located in Greater London
Croydon power stations
Location of Croydon power stations
Country England
Location Croydon, Greater London
Coordinates 51°22′44″N 0°07′16″W / 51.378826°N 0.121064°W / 51.378826; -0.121064Coordinates: 51°22′44″N 0°07′16″W / 51.378826°N 0.121064°W / 51.378826; -0.121064
Commission date 1896
Decommission date 1984
Operator(s) Central Electricity Generating Board
Thermal power station
Primary fuel Coal-fired
grid reference TQ307661

The Croydon power stations refers to a pair of demolished coal-fired power stations and to a gas-fired power station in the Purley Way area of Croydon, London. The coal-fired stations operated from 1896 until 1984, and the gas-fired station opened in 1999. Croydon B power station's chimneys have been retained as a local landmark.

The first power station built on the site, which would later become known as Croydon A power station, was opened in 1896. The station was built near Croydon Gas Works by the Croydon Corporation. The generating equipment at the station was replaced in 1924, when low pressure equipment of 21 megawatts (MW) and high pressure equipment of 29 MW was installed, giving the station a generating capacity of 50 MW. This corresponded with the arrival of English Electric locomotive No.692, which used an overhead wire electric system, for the shunting of coal. In 1959 this was replaced by a steam locomotive from Littlebrook Power Station, built by W. G. Bagnall in 1946. In 1970, Croydon A was rarely active and was one of the few power stations in the country to still use wooden cooling towers. It operated until 1973.

Planning for a Croydon B power station was begun in 1939, with the architecture designed by Robert Atkinson. However, these plans were delayed by World War II. Immediately after the end of the war, construction work began on the new station. The station was built by Sir Robert McAlpine & Sons, who also used two locomotives during the construction work; the first was Hudswell Clarke No.82, used between 1946 and 1948, the second was Hudswell Clarke No.55, used for the remainder of 1948. The station was finally opened in 1950.

The station originally had a generating capacity of 198 MW, but in the 1960s, a 140 MW gas turbine was installed at for peak use, bringing the generating capacity up to 338 MW.

Once delivered to the station, coal was shunted by locomotives. Croydon B had a fleet of three shunting locomotives, all built by Peckett and Sons with the works numbers No.2103, No.2104 and No.2105. These three steam locomotives were superseded by diesels in the 1960s.


...