*** Welcome to piglix ***

Commonwealth Railways G class

Commonwealth Railways G class
Preserved G1 at the National Railway Museum, Port Adelaide, 2014.
Preserved G1 at the National Railway Museum
in April 2014
Type and origin
Power type Steam
Builder Baldwin Locomotive Works (12)
Clyde Engineering (4)
Toowoomba Foundry (10)
Build date 1914-1917
Total produced 26
Number rebuilt 7
Specifications
Configuration:
 • Whyte 4-6-0
Gauge 1,435 mm (4 ft 8 12 in) standard gauge
Loco weight 106 long tons (108 t; 119 short tons)
Fuel type Coal
Water cap 4,850 imp gal (22,000 L; 5,820 US gal)
Boiler pressure 160 psi (11 bar; 1,100 kPa)
Cylinder size 20 in × 26 in (508 mm × 660 mm)
Performance figures
Tractive effort 22,187 lbf (98.69 kN)
Career
Operators Commonwealth Railways
Numbers G1-G26
First run March 1914
Preserved G1
Current owner National Railway Museum
Disposition 1 preserved, 25 scrapped
Type and origin
Power type Steam
Builder Baldwin Locomotive Works (12)
Clyde Engineering (4)
Toowoomba Foundry (10)
Build date 1914-1917
Total produced 26
Number rebuilt 7
Specifications
Configuration:
 • Whyte 4-6-0
Gauge 1,435 mm (4 ft 8 12 in) standard gauge
Loco weight 106 long tons (108 t; 119 short tons)
Fuel type Coal
Water cap 4,850 imp gal (22,000 L; 5,820 US gal)
Boiler pressure 160 psi (11 bar; 1,100 kPa)
Cylinder size 20 in × 26 in (508 mm × 660 mm)
Performance figures
Tractive effort 22,187 lbf (98.69 kN)
Career
Operators Commonwealth Railways
Numbers G1-G26
First run March 1914
Preserved G1
Current owner National Railway Museum
Disposition 1 preserved, 25 scrapped

The Commonwealth Railways G class was a class of 4-6-0 tender locomotives of the Commonwealth Railways, Australia. The class operated on the 1,435 mm (4 ft 8 12 in) Trans-Australian Railway.

In order to operate passenger trains on the then under construction Trans-Australian Railway, Commonwealth Railways ordered sixteen locomotives of the same design as the New South Wales Government Railways' P class (later the C32 class), but with higher capacity tenders.

Four were built by Clyde Engineering, Sydney and twelve by the Baldwin Locomotive Works, Philadelphia with all delivered between March and August 1914. A further ten were delivered by the Toowoomba Foundry between June 1916 and August 1917.

Initially they were used on construction trains, until the line opened in October 1917, when they commenced hauling passenger trains including the Trans Australian. Although just as successful as their New South Wales counterparts, the high mineral content of the water caused problems. Two were withdrawn in 1925 followed by a third in 1930.

In the 1930s, seven were fitted with superheated boliers to replace the saturated examples. These were reclassifed as the Ga class. Following their displacement by the larger C class locomotives in 1938, they were gradually withdrawn.

By the time dieselisation commenced in 1951, only eleven remained in service. Most were withdrawn in 1952 as the GM class diesels entered service. The last remained in service as a shunter at Port Pirie until withdrawn in September 1958.


...
Wikipedia

...