In the oil and gas industries, coiled tubing refers to a very long metal pipe, normally 1 to 3.25 in (25 to 83 mm) in diameter which is supplied spooled on a large reel. It is used for interventions in oil and gas wells and sometimes as production tubing in depleted gas wells. Coiled tubing is often used to carry out operations similar to wirelining. The main benefits over wireline are the ability to pump chemicals through the coil and the ability to push it into the hole rather than relying on gravity. Pumping can be fairly self-contained, almost a closed system, since the tube is continuous instead of jointed pipe. For offshore operations, the 'footprint' for a coiled tubing operation is generally larger than a wireline spread, which can limit the number of installations where coiled tubing can be performed and make the operation more costly. A coiled tubing operation is normally performed through the drilling derrick on the oil platform, which is used to support the surface equipment, although on platforms with no drilling facilities a self-supporting tower can be used instead. For coiled tubing operations on sub-sea wells a Mobile Offshore Drilling Unit (MODU) e.g. semi-submersible, Drillship etc. has to be utilized to support all the surface equipment and personnel, whereas wireline can be carried out from a smaller and cheaper intervention vessel. Onshore, they can be run using smaller service rigs, and for light operations a mobile self-contained coiled tubing rig can be used.
The tool string at the bottom of the coil is often called the bottom hole assembly (BHA). It can range from something as simple as a jetting nozzle, for jobs involving pumping chemicals or cement through the coil, to a larger string of logging tools, depending on the operations.
Coil tubing has also been used as a cheaper version of work-over operations. It is used to perform open hole drilling and milling operations. It can also be used to fracture the reservoir, a process where fluid is pressurised to thousands of psi on a specific point in a well to break the rock apart and allow the flow of product. Coil tubing can perform almost any operation for oil well operations if used correctly.
The most typical use for coiled tubing is circulation or deliquification. A hydrostatic head (a column of fluid in the well bore) may be inhibiting flow of formation fluids because of its weight (the well is said to have been killed). The safest (though not the cheapest) solution would be to attempt to circulate out the fluid, using a gas, frequently nitrogen (Often called a 'Nitrogen Kick'). By running coiled tubing into the bottom of the hole and pumping in the gas, the kill fluid can be forced out to production. Circulating can also be used to clean out light debris, which may have accumulated in the hole. Coiled tubing umbilicals can convey hydraulic submersible pumps and jet pumps into wells. These pumps allow for inexpensive and noninvasive well cleanouts on low-pressure CBM (coal bed methane) gas wells. These umbilicals can also be run into deviated wells and horizontal laterals.