Central Plains Water, or, more fully, the Central Plains Water Enhancement Scheme, is a large-scale proposal for water diversion, damming, reticulation and irrigation for the Central Plains of Canterbury, New Zealand. Construction started on the scheme in 2014.

The original proposal involved diversion of water, the construction of a storage dam, tunnels and a series of canals and water races to supply water for irrigation to an area of 60,000 hectares on the Canterbury Plains. Water will be taken from the Rakaia and Waimakariri Rivers. In June 2010, resource consents for the scheme were approved in a revised form without the storage dam. From 2010 to 2012, the resource consents were under appeal to the Environment Court. In July 2012, the resource consents for the scheme were finalised by the Environment Court.

The Central Plains Water Enhancement Scheme originated as a feasibility study jointly initiated and funded by Christchurch City Council and Selwyn District Council.

The Central Plains Water Enhancement Scheme is contentious. It is opposed by community, recreation and environment groups, some city and regional councillors, and some corporate dairying interests. The scheme is supported by Christchurch City Council and Selwyn District Council staff and some councillors, irrigation interests, consultants, farming interests, and more recently, some corporate dairying interests.

Canterbury Regional Council has summarised the scope of the Central Plains Water enhancement scheme as follows;

'The applicants propose to irrigate 60,000 hectares of land between the Rakaia and Waimakariri Rivers from the Malvern foothills to State Highway One. Water will be abstracted at a rate of up to 40 m3/s from two points on the Waimakariri River and one point on the Rakaia River. The water will be irrigated directly from the river and via a storage system. The proposal includes a 55 metre high storage dam within the Waianiwaniwa Valley and associated land use applications for works within watercourses.'

The proposed dam would be about 2 kilometres long, with a maximum height of 55 metres, with a base width of about 250 metres, and 10 m wide crest, with a capacity of 280 million cubic metres. The dam would be 1.5 kilometres north east of the town of Coalgate. The two rivers and the reservoir would be connected by a headrace canal, 53 kilometres long, 5 metres deep and 30 metres wide (40–50 metres including embankments). Water would be delivered to farmers via 460 kilometres of water races, ranging in width from 14 to 27 metres, including the embankments.


...