*** Welcome to piglix ***

Central Japan Railway

Central Japan Railway Company
Native name
東海旅客鉄道株式会社
Public KK
Traded as :
TOPIX Core 30 Component
Industry Private railway
Predecessor Japanese National Railways (JNR)
Founded April 1, 1987 (privatization of JNR)
Headquarters JR Central Towers
1-1-4 Meieki, Nakamura-ku, Nagoya, Aichi 450-6101
, Japan
Area served
Tokai region
Key people
Yoshiyuki Kasai, Chairman
Masayuki Matsumoto, President
Products TOICA, EX-IC (a rechargeable contactless smart card)
Services passenger railways
travel agency services
wholesale and retail
parking lot operations
real estate
food and beverage sales
casualty insurance
other related services
Revenue Increase¥1,672,295 million (2014)
Increase¥506,598 million (2014)
Increase¥264,134 million (2014)
Total assets Increase¥5,217,982 million (2014)
Total equity Increase¥2,020,196 million (2014)
Owner Mizuho Corporate Bank (4.37%)
Japan Trustee Services Bank (4.29%)
The Master Trust Bank of Japan (3.48%)
The Nomura Trust & Banking Co. (3.18%)
The Bank of Tokyo-Mitsubishi UFJ (2.98%)
Nippon Life (2.23%)
Toyota Motors (1.79%)
The JR Central Employees Shareholding Association (1.73%)
Mizuho Bank (1.53%)
(as of March 31, 2009)
Number of employees
16,193 (as of March 31, 2008)
Divisions Conventional lines operations
Shinkansen operations
Subsidiaries 39 group companies,
including Nippon Sharyo (since October 2008)
Website english.jr-central.co.jp/index.html
     Central Japan Railway Company
JR logo (central).svg
JRC-TEC-N700.jpg
Operation
National railway Japan Railways Group
Infrastructure company Japan Railway Construction, Transport and Technology Agency
Statistics
Ridership 0.528 billion per year
Passenger km 55.811 billion per year
System length
Total 1,970.8 km (1,224.6 mi)
Double track 1,086.8 km (675.3 mi) (55.1%)
Electrified 1,491.7 km (926.9 mi) (75.7%)
High-speed 552.6 km (343.4 mi) (28.0%)
Track gauge
Main 1,067 mm (3 ft 6 in)
High-speed 1,435 mm (4 ft 8 12 in)
Electrification
Main 1,500 V DC overhead catenary 1,418.2 km (881.2 mi)
25 kV AC 60 Hz overhead  552.6 km (343.4 mi)
Tokaido Shinkansen
Features
No. stations 403
Map
Service area
Shinkansen station layouts
TOICA Service Area (in Japanese)
Map
Service area
Shinkansen station layouts
TOICA Service Area (in Japanese)

The Central Japan Railway Company (東海旅客鉄道株式会社, Tōkai Ryokaku Tetsudō Kabushiki-gaisha) is the main railway company operating in the Chūbu (Nagoya) region of central Japan. It is officially abbreviated in English as JR Central and in Japanese as JR Tōkai (JR東海). Its headquarters are located in the JR Central Towers in Nakamura-ku, Nagoya, Aichi Prefecture.

The company's operational hub is Nagoya Station. The busiest railway line it operates is the Tōkaidō Main Line between Atami Station and Maibara Station. JR Central also operates the Tōkaidō Shinkansen between Tokyo Station and Shin-Ōsaka Station. Additionally it is responsible for the Chūō Shinkansen—a proposed maglev service between Tokyo Station (or Shinagawa Station) and Ōsaka Station (or Shin-Ōsaka Station), of which a short demonstration section has been built. Currently, the company is conducting demonstrations of its shinkansen to railway officials from different countries in the effort to market bullet train technology overseas.

JR Central is Japan's most profitable and highest throughput high-speed-rail operator, carrying 138 million high-speed-rail passengers in 2009, considerably more than the world's largest airline. Japan recorded a total of 289 million high-speed-rail passengers in 2009.


...
Wikipedia

...