*** Welcome to piglix ***

Butterfield Elementary School (Lake Elsinore, California)

Butterfield Elementary School
Address
16275 Grand Ave.
Riverside County, California
Lake Elsinore, California 92530
United States
Information
Type Public
Opened 1982 - 2010
School district Lake Elsinore Unified School District
Specialist Visual and Performing Arts Magnet
Principal Last principal, Dorri Neal
Grades Was Kindergarten – Fifth Grade
Number of students 950
School color(s) Black/Turquoise
Nickname Bobcats
Feeder to Lakeland Village Middle School
High School Lakeside High School
District website http://www.leusd.k12.ca.us
Website

Butterfield Elementary School was a publicly funded grade school in the Lake Elsinore Unified School District, in California, USA. It was named after the old Butterfield Overland Stage route which runs in front of the school. It provided many innovative programs to its students. In 1995, Butterfield became the new home of the first Elementary Visual and Performing Arts (VAPA) Magnet School Program in Riverside County (its first home had been Elsinore Elementary School). Coincidentally, the second VAPA school program in Riverside County started in September 1991 at Butterfield School of the Arts in the Moreno Valley Unified School District, in Moreno Valley, CA

Butterfield Elementary School received many grants and awards, especially in the performing arts field. Students from Butterfield performed with well-known groups and celebrities, such as The Young Americans and Mark Walberg. This school closed permanently on June 3, 2010, after 28 years of service to the community. The entire student and teacher population (along with the same attendance boundaries) moved 3 miles south to the campus of Lakeland Village Middle School which was renamed Lakeland Village School as it became a K-8 school. This was basically a relocation of the Butterfield Community into a new location, which was to an underused four-year-old middle school building. The school kept the same students and teachers, although the classified staff and the principal changed. Two-thirds of the existing middle school population of students and teachers moved to different schools. The Butterfield name and history were carried forward in the renaming of the Lakeland Village auditorium as the Butterfield Performing Arts Center, although the Butterfield Community continued on under the new name.

A renaissance of Butterfield Elementary by the Fall of 2015 was planned, as the LEUSD hired an architectural firm and construction company to rebuild the campus. It was expected that some primary grades would return to the campus for the 2015/16 year and the rest of the campus would reopen to Grades up through the 6th grade by the fall of 2016. At that time Lakeland Village School would have reformed as a 7th/8th grade Junior High Campus, as the remaining elementary students would have returned to Butterfield. However, after investigation by the planning and architectural firms, it was decided that reconstruction costs would be too high to deal with possible seismic refits and the plan to reopen the school has been cancelled. The idea of a Butterfield Renaissance appears to now be dead.


...
Wikipedia

...