*** Welcome to piglix ***

Blue Line (Chennai Metro)

Blue Line
Overview
Native name நீல வழித்தடம்
Type Rapid transit
System Chennai Metro
Status Partially Operative
(Under Construction)
Termini Chennai International Airport
Wimco Nagar
Stations 25
Operation
Opened 21 September 2016
Owner CMRL
Operator(s) Chennai Metro Rail Limited
Character Underground and Elevated
Technical
Line length 32.1
Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification 25 kV, 50 Hz AC through overhead catenary
Operating speed 80 km/h (50 mph)

The Blue Line or Line 1 is one of the two lines of Chennai Metro, Phase 1 Project. The line stretches from Chennai International Airport to Washermanpet with further extension to Wimco Nagar. The line consist of 25 Stations where 17 stations belong to phase 1 and the rest 8 stations belong to the extension. Out of the 17 stations 11 stations are underground and 6 are elevated.

The line connects the northeast and the southwest ends of the city. The stations include :

These are the proposed stations between Washermanpet and Wimco Nagar



...
Wikipedia

...