*** Welcome to piglix ***

Bayreuth–Hollfeld railway

Bayreuth–Hollfeld
Route number: ex 842
Line number: 5002
Line length: 32.7 km (20.3 mi)
Track gauge: 1,435 mm (4 ft 8 12 in)
Maximum incline: 1.92  %
Minimum radius: 250 m (820 ft)
from Neuenmarkt-Wirsberg
from Warmensteinach
0,0 Bayreuth Hbf
to Weiden
Red Main
Bundesstraße 2
Bundesstraße 22
1,6 to Schnabelwaid
1,9 Bundesstraße 2
2,0 Kreuzstein
Gasworks siding
2,3 Bayreuth University(formerly planned)
Röhrensee
3,7 Röhrensee
5,3 Bayreuth Altstadt
to Kulmbach
6,9 Fantaisie-Eckersdorf(since 1907)
9,4 Mistelbach
11,6 Pittersdorf
14,8 Mistelgau
17,2 Frankenhaag
20,7 Obernsees
22,1 Truppach
24,8 Plankenfels
old Bundesstraße
27,2 Wadendorf
29,4 Stechendorf-Welkendorf
31,1 Moggendorf
32,7 Hollfeld

The Bayreuth–Hollfeld railway was a branch line in the Bavarian province of Upper Franconia. It ran from Bayreuth to Hollfeld in the northern part of Franconian Switzerland.

Plans for the construction of this line went back to the 1860s. Originally an even longer railway was planned: to the west via Forchheim–Höchstadt to Rothenburg and in the east into the Fichtelgebirge mountains. A link to Bamberg via Scheßlitz was also considered. But due to the cost of building a route in such difficult terrain only the above-mentioned line was built. Its construction took place between 1902 and 1904 and the opening ceremony was held on 9 March 1904. The journey time for the route, which was just under 33 kilometres long, was two hours. To begin with there were only three pairs of trains per day.

The exact length of the line (from the centre line of the station buildings at each end) was 32.73 km and, as the crow flies, 20.5 km. The station at Bayreuth was 343.72 m above sea level and the terminus at Hollfeld was 41.58 m higher. The smallest curve radius was 250 m and the steepest incline was 19.2 ‰.

The Bayreuth municipal department (today the BEW) had a direct rail link to the gas works southwest of the Hofgarten. This railway link branched off from the main line in the vicinity of the present-day university between the halts of Kreuzstein and Röhrensee, roughly where the bridge over the Emil-Warburg-Weg is situated today. From there it ran northwards, crossed the Sendelbach stream, swung westwards and reached the gas works on Birkenstrasse after a good 800 metres.

Although it had been planned as early as 1918, it cannot have been built until the 1950s because no railway can be seen in US Air Force air photographs taken immediately after the Second World War. Its dismantling presumably followed the closure of the coal-to-gas plant at the end of the 1960s and before the construction of the Bayreuth city ring road.

In the industrial estate on Otto-Hahn-Strasse between Kreuzstein Halt and Bayreuth Altstadt station several firms and sheds were connected to the railway by industrial sidings. Some were sporadically used even into the early 1990s. A timber merchant's on Justus-Liebig-Strasse and the curtain factory on Leuschnerstrasse also had rail access.


...
Wikipedia

...