*** Welcome to piglix ***

Barming railway station

Barming National Rail
Barming railway station in 2009.jpg
Location
Place Barming
Local authority Tonbridge and Malling
Grid reference TQ729568
Operations
Station code BMG
Managed by Southeastern
Number of platforms 2
DfT category E
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2011/12 Increase 0.127 million
2012/13 Decrease 0.124 million
2013/14 Increase 0.128 million
2014/15 Increase 0.130 million
2015/16 Increase 0.136 million
History
Key dates Opened 1 June 1874 (1 June 1874)
National RailUK railway stations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Barming from Office of Rail and Road statistics. Methodology may vary year on year.
170433 at Edinburgh Waverley.JPG

Barming railway station is located in Tonbridge and Malling Borough, west of Maidstone in Kent, England and approximately 1 mile from Barming and Maidstone Hospital. Barming railway station and all the trains serving it are operated by Southeastern.

Barming station opened on 1 June 1874 as part of the London, Chatham and Dover Railway's Maidstone Line from Swanley Junction to Maidstone. The goods yard had two sidings, one of which served a goods shed. Freight facilities were withdrawn on 5 December 1960. The signal box closed on 24 April 1982.

The platforms are of 6-car length only, despite a small number of peak-hour services being formed from 8 cars. The original station building remains on the down (Country-bound) platform 2, with a substantial wooden shelter on the up (London-bound) platform. The ticket office is manned for limited hours during the morning peak period on Mondays to Fridays; at other times a PERTIS 'permit to travel' machine, also located on the down platform, suffices. A passenger information screen is located on the down platform 2 and provides information relating to train running times for both platforms. The station entrances/exits are on the down Platform 2. There is no level access to Platform 1.

The concrete footbridge which spanned the tracks at the western end of the station, linking the platforms, was life-expired and demolished in early 2013. It was an example of the standard pre-fabricated design built at the Southern Railway's concrete factory at Exmouth Junction, east of Exeter. The replacement footbridge to the standard Network Rail design is at the extreme eastern end of the station.

The typical off-peak service from the station is one train per hour to Ashford International via Maidstone East and one train per hour to London Victoria.


...
Wikipedia

...