Baishan Dam

Baishan Dam
Baishan Dam is located in China
Baishan Dam
Location of Baishan Dam in China
Country China
Location Huadian, Jilin Province
Coordinates 42°43′35″N 127°13′28″E / 42.72639°N 127.22444°E / 42.72639; 127.22444Coordinates: 42°43′35″N 127°13′28″E / 42.72639°N 127.22444°E / 42.72639; 127.22444
Status In use
Construction began 1975
Opening date 1984
Dam and spillways
Type of dam Arch gravity
Impounds Second Songhua River
Height 149.5 m (490 ft)
Length 677.5 m (2,223 ft)
Dam volume 1,663,000 m3 (58,728,291 cu ft)
Spillways 4
Spillway type Service, crest overflow
Reservoir
Creates Baishan Reservoir
Total capacity 6,500,000,000 m3 (5,269,636 acre·ft)
Catchment area 19,000 km2 (7,336 sq mi)
Power station
Commission date Phase I: 1984
Phase II: 1992
PS: 2006
Type Conventional and Pumped-storage
Hydraulic head 110 m (361 ft) (design)
Turbines 5 x 300 MW (400,000 hp) Francis turbines conventional
2 x 150 MW (200,000 hp) Pumped-storage
Installed capacity 1,800 MW (2,400,000 hp)

The Baishan Dam (Chinese: 白山水库, meaning: "White Mountain Dam") is an arch-gravity dam on the Second Songhua River near the town of Baishanzhen, Huadian, Jilin Province, China. The purpose of the dam is hydroelectric power generation and flood control. The dam supplies water to five turbine-generators in two different powerhouses for an installed capacity of 1,500 megawatts (2,000,000 hp) while it can also control a design 19,100 cubic metres per second (670,000 cu ft/s) flood. Additionally, it has a 300 megawatts (400,000 hp) pumped-storage hydroelectric generation capacity. It is named after Baekdu Mountain (White Mountain), near the city of Baishan.

Construction on the dam began in May 1975, the reservoir began to fill on September 16, 1982 and by the end of 1984, the first phase of three generators was operational. Another two generators in the project's second phase were operational by 1992. The dam submerged an area of 17.67 square kilometres (6.82 sq mi), displacing about 10,300 people.

In March 2000, a feasibility study report on a pumped-storage capability for the dam was approved. In August 2002, construction started on installing two 150 MW reversible pump generators and by July 2006, they were operational.

The Baishan Dam is a 149.5 metres (490 ft) tall and 677.5 metres (2,223 ft) long arch gravity dam composed of 1,663,000 cubic metres (58,700,000 cu ft) of concrete. It withholds a 6,500,000,000 cubic metres (5,300,000 acre·ft) reservoir of which 3,540,000,000 cubic metres (2,870,000 acre·ft) is active or "useful" storage and 950,000,000 cubic metres (770,000 acre·ft) is flood storage. The dam's spillway contains four 12 by 13 metres (39 ft × 43 ft) openings and three 6 by 7 metres (20 ft × 23 ft) mid-level openings on its orifice. All the dam's openings can discharge a design of 19,100 cubic metres per second (670,000 cu ft/s), check standard of 26,200 cubic metres per second (930,000 cu ft/s) and maximum of 32,200 cubic metres per second (1,140,000 cu ft/s) of water.


...