Bagsværd Church is a Lutheran church in Bagsværd on the northern outskirts of Copenhagen, Denmark. Designed in 1968 by Jørn Utzon, it was completed in 1976. The building is considered to be a masterpiece of contemporary church architecture, especially its bright, naturally illuminated interior and its ceiling straddled with softly rounded vaulting.

In 1538, the church in Bagsværd was pulled down on the orders of the king so that the stones could be used to repair the old Catholic bishop's palace which, after the Reformation, was to be used as a seminary for the new Lutheran Church. Thereafter, the parishioners had to use the church in Gladsaxe though there was increasing interest in building a new church in Bagsværd. It therefore came as no surprise that the congregational council took special interest in the church Utzon had included in a competition exhibit for the town centre in Farum when it was displayed in Gladsaxe at an architectural exhibition in 1967. When he was asked whether he would like to submit a proposal for a church at Bagsværd, Utzon was elated: "There I stood, and was offered the finest task an architect can have — a magnificent time when it was the light from above that showed us the way." The proposal he submitted the following year included four sketches: the first one showed a group of people under the clouds on a beach, the last one depicted the same people as a congregation in a church where the clouds had become the sculptural roof. They were intended to illustrate Utzon's understanding of the overall concept.

There were a series of difficulties over the funding of the building which finally cost DKK 10 million after Utzon had reduced its size by 10 percent and the Gladsaxe municipality had contributed DKK 1 million. A building permit was granted in 1973 but, experiencing financial difficulties, the church ministry quickly attempted to halt construction. However, before their ruling came into force, the contractors Christiani & Nielsen established a presence on the site allowing work to begin. The new church was consecrated on 15 August 1976.

Located on a narrow plot in a suburban setting, the building itself is narrow, and has an austere façade which encloses the various rooms and a number of small courtyards. Surrounded by birch trees, the exterior walls are faced with white prefabricated concrete panels and white glazed tiles. The aluminium roof gives the church a rather industrial look. Glass sections provide lighting over the connecting corridors. Covering an area of 1,700 square meters, the tight geometrical plan consists of three sections and a courtyard between two parallel corridors.


...
Wikipedia

...