*** Welcome to piglix ***

B-58 Hustler

B-58 Hustler
Convair B-58A Hustler in flight (SN 59-2442). Photo taken on June 29, 1967 061101-F-1234P-019.jpg
Convair B-58A in flight, June 1967
Role Supersonic strategic bomber
National origin United States
Manufacturer Convair
First flight 11 November 1956
Introduction 15 March 1960
Retired 31 January 1970
Status Retired
Primary user United States Air Force
Number built 116
Unit cost
US$12.44 million
Variants Convair Model 58-9

The Convair B-58 Hustler was the first operational jet bomber capable of Mach 2 flight. The aircraft was designed by Convair engineer Robert H. Widmer and developed for the United States Air Force for service in the Strategic Air Command (SAC) during the 1960s. It used a delta wing, which was also employed by Convair fighters such as the F-102, with four General Electric J79 engines in pods under the wing. It carried five nuclear weapons; four on pylons under the wings, and one nuclear weapon and fuel in a combination bomb/fuel pod under the fuselage, rather than in an internal bomb bay.

Replacing the Boeing B-47 Stratojet medium bomber, it was originally intended to fly at high altitudes and supersonic speeds to avoid Soviet fighters. The B-58 received a great deal of notoriety due to its sonic boom, which was often heard by the public as it passed overhead in supersonic flight.

The introduction of highly accurate Soviet surface-to-air missiles forced the B-58 into a low-level penetration role that severely limited its range and strategic value, and it was never employed to deliver conventional bombs. This resulted in only a brief operational career between 1960 and 1970 when the B-58 was succeeded by the smaller, swing-wing FB-111A.

The genesis of the B-58 program came in February 1949, when a Generalized Bomber Study (GEBO II) had been issued by the Air Research and Development Command (ARDC) at Wright-Patterson AFB, Ohio, for the development of a supersonic, long range, bombardment aviation platform. The proposed bomber's design and development was to begin less than two years after sustained supersonic flight had successfully been achieved. A number of contractors submitted bids to perform the generalized study (that hopefully would lead to a development contract) including Boeing, Convair, Curtiss, Douglas, Martin and North American Aviation.


...
Wikipedia

...