Ayago Power Station

Ayago Power Station
Ayago Hydroelectric Power Station is located in Uganda
Ayago Hydroelectric Power Station
Map of Uganda showing the location of Ayago.
Country Uganda
Location Ayago, Nwoya District
Coordinates 02°21′47″N 31°55′12″E / 2.36306°N 31.92000°E / 2.36306; 31.92000Coordinates: 02°21′47″N 31°55′12″E / 2.36306°N 31.92000°E / 2.36306; 31.92000
Purpose Power
Status Proposed
Dam and spillways
Impounds Victoria Nile
Power station
Name Ayago Power Station
Commission date 2022 (Expected)
Installed capacity 600 MW

Ayago Power Station is a proposed 600MW hydroelectric power project to be constructed in Uganda.

The Power Station will be located at Ayago (sometimes spelled Aiago), on the Victoria Nile, in Nwoya District. This location lies approximately 38 kilometres (24 mi), by road, south of Nwoya, the location of the district headquarters. This location is within the confines of Murchison Falls National Park.

Ayago Power Station is a 600 megawatts (800,000 hp) hydroelectric power plant that will be constructed on the Victoria Nile, downstream of Karuma Power Station, but upstream of Murchison Falls. The project will be developed in two simultaneous phases, known as Ayago North (estimated capacity:350MW) and Ayago South (estimated capacity:250MW). The Ayago Power Station is one of three hydropower projects that have been earmarked for immediate development, together with Karuma Power Station (600MW) and Isimba Power Station (183MW), to mitigate the chroninic, recalcitrant power shortages that have plagued Uganda since the 1990s, and to meet the projected national requirement of 1,130MW by 2023.

The Indian state-owned energy and manufacturing company, BHEL, had estimated the cost of the project at about US$350 in 2007. But that was for a project with planned capacity of 200MW to 300MW, back in 2007.

In 2008, the Government of Japan, through the Japan International Cooperation Agency (JICA), in collaboration with the Government of Uganda, began new preparations for fresh eviromental impact assessments, International bidding for a contractor and commitment as a lead funding source for the project.


...