Aubin Grove
|
|||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Station entrance in April 2017
|
|||||||||||
Location |
Kwinana Freeway, Success and Atwell Australia |
||||||||||
Coordinates | 32°09′18″S 115°51′28″E / 32.1550°S 115.8579°ECoordinates: 32°09′18″S 115°51′28″E / 32.1550°S 115.8579°E | ||||||||||
Owned by | Public Transport Authority | ||||||||||
Operated by | Transperth | ||||||||||
Line(s) | Mandurah | ||||||||||
Distance | 24.3 kilometres from Perth | ||||||||||
Platforms | 2 (1 island) | ||||||||||
Tracks | 2 | ||||||||||
Bus routes | 7 | ||||||||||
Bus stands | 4 | ||||||||||
Construction | |||||||||||
Structure type | Ground | ||||||||||
Parking | 2,000 bays | ||||||||||
Bicycle facilities | 88 bays | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | RAG 99671 (platform 1) 99672 (platform 2) |
||||||||||
Fare zone | 3 | ||||||||||
History | |||||||||||
Opened | 23 April 2017 | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
|
Aubin Grove station is a railway station on the Transperth network. Located on the Mandurah line, 24.3 kilometres from Perth station it serves the suburbs of Success, Atwell and Aubin Grove.
Aubin Grove station is located in the median strip of the Kwinana Freeway, just north of Russell Road between Cockburn Central and Kwinana stations. It is largest park & ride station in Perth with 2,000 parking spaces.
In July 2014, a tender was issued to build the station. Construction started in late January 2016, with the station opening on 23 April 2017.
Aubin Grove station is served by Transperth Mandurah line services.
There are seven bus routes serve the station, connecting north to Cockburn Central Station, southeast to Wandi, southwest to Hammond Park and west to Wattleup.
Aubin Grove
Zone 3