*** Welcome to piglix ***

Askam railway station

Askam National Rail
Askam and Ireleth-Station 2-17.12.06.jpg
The northbound platform
Location
Place Askam-in-Furness
Local authority Barrow-in-Furness
Coordinates 54°11′20″N 3°12′18″W / 54.189°N 3.205°W / 54.189; -3.205Coordinates: 54°11′20″N 3°12′18″W / 54.189°N 3.205°W / 54.189; -3.205
Grid reference SD215777
Operations
Station code ASK
Managed by Northern
Number of platforms 2
DfT category F2
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2011/12 Increase 62,610
2012/13 Increase 64,862
2013/14 Decrease 63,186
2014/15 Increase 63,652
2015/16 Decrease 63,440
National RailUK railway stations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Askam from Office of Rail and Road statistics. Methodology may vary year on year.
170433 at Edinburgh Waverley.JPG

Askam Railway Station serves the villages of Askam-in-Furness and Ireleth in Cumbria, England. The railway station is a stop on the scenic Cumbrian Coast Line. Some through trains to the Furness Line stop here. It is operated by Northern who provide all passenger train services. Originally, the station was built here to transport the iron ore being mined in Askam out of the village.

The railway along the Cumbrian coast was completed over many years by numerous small firms, who often would refuse to work together. However, eventually 'Grouping' forced the companies to work together on the railway, instead of constantly competing. Further problems were encountered when the people building the railway ran out of money, and so the proposed Duddon Viaduct, from Askam to Millom, was abandoned. Instead, a different route, going by way of Foxfield, was planned. This saved £37,000.

The plans were drawn up in 1843, and shortly afterwards, sections of the Furness Railway were built. The original section through Askam, coming from Millwood Junction, and going on to Kirkby Slate Warf was part of the original railway line. This was officially opened on 3 June 1846. A passenger service then began operating on 24 August of that same year.

Originally, there was a simple stop in Askam. This was abolished in 1859; the later growth of Askam meant that it soon deserved a full sized station. In 1876 the vicar of Askam complained at a shareholders' meeting of the passenger accommodation at Askam:

They had both an up and down platform, but they were simply wooden railings with gravel banks. They were useful platforms, as they were used not only for passengers, but for cattle. On one side of the line, there was some slight covered accommodation, but in bad weather this was so thronged with men smoking and spitting that it was not suitable for ladies. On the other side, there was no covered accommodation, whatever, but the Station Master, like all other officials connected with the railway, was very kind to the public, by allowing them the use of the only room he had for living and cooking in.

(The Furness Railway's managing director responded that there were various plans for the improvement of the station, but nothing could be done until a dispute over the provision of a bridge at the station was resolved.)


...
Wikipedia

...