Ashby Canal | |
---|---|
The canal near Congerstone
|
|
Specifications | |
Length | 31 miles (50 km) |
Maximum boat length | 72 ft 0 in (21.95 m) |
Maximum boat beam | 7 ft 0 in (2.13 m) |
Status | part open, part under restoration |
Navigation authority | Canal & River Trust |
History | |
Principal engineer | Robert Whitworth |
Other engineer(s) | Benjamin Outram |
Date of act | 1794 |
Date completed | 1804 |
Date closed | 1944, 1957, 1966 |
Geography | |
Start point | Ashby-de-la-Zouch |
End point | Marston |
Branch of | Coventry Canal |
The Ashby-de-la-Zouch Canal is a 31-mile (50 km) long canal in England which connected the mining district around Moira, just outside the town of Ashby-de-la-Zouch, with the Coventry Canal at Bedworth in Warwickshire. It was opened in 1804, and a number of tramways were constructed at its northern end, to service collieries. The canal was taken over by the Midland Railway in 1846, but remained profitable until the 1890s, after which it steadily declined. Around 9 miles (14 km) passed through the Leicestershire coal field, and was heavily affected by subsidence, with the result that this section from Moira, southwards to Snarestone, was progressively closed in 1944, 1957 and 1966, leaving 22 miles (35 km) of navigable canal.
The abandoned section is the subject of a restoration project and is the first canal where a new section has been authorised under the Transport and Works Act 1992. The Transport and Works Order was obtained by Leicestershire County Council, as some of the original route has been infilled and built over, and restoration therefore involves construction on a new route through the centre of Measham. It is hoped that all but the final 1-mile (1.6 km) section of the canal can be re-opened. An isolated section near Moira Furnace and the National Forest visitor centre was opened between 1999 and 2005, and is the location for an annual trailboat festival.
The canal starts at a junction with the Coventry Canal just outside Bedworth and travels north-east for about 7 miles (11 km) through the town of Hinckley. It then continues to run north through largely rural and remote countryside for another 15 miles (24 km) until reaching its terminus at Snarestone. Near Sutton Cheney Wharf, it passes the foot of Ambion Hill, the site of the Battle of Bosworth Field. At Shackerstone, it passes the station that is the headquarters of the Battlefield Line Railway.