*** Welcome to piglix ***

Ardlui railway station

Ardlui National Rail
Scottish Gaelic: Àird Laoigh
Ardlui.jpg
Ardlui station is unusually busy as passengers on a Mallaig and Oban - Glasgow train stretch their legs whilst waiting for a late running northbound train to cross
Location
Place Ardlui
Local authority Argyll and Bute
Coordinates 56°18′07″N 4°43′18″W / 56.3019°N 4.7217°W / 56.3019; -4.7217Coordinates: 56°18′07″N 4°43′18″W / 56.3019°N 4.7217°W / 56.3019; -4.7217
Grid reference NN316155
Operations
Station code AUI
Managed by Abellio ScotRail
Number of platforms 2
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2011/12 Increase 2,252
2012/13 Decrease 2,216
2013/14 Increase 4,566
2014/15 Increase 5,074
2015/16 Decrease 5,072
History
Original company West Highland Railway
Pre-grouping North British Railway
Post-grouping LNER
7 August 1894 Opened
National RailUK railway stations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Ardlui from Office of Rail and Road statistics. Methodology may vary year on year.
170433 at Edinburgh Waverley.JPG

Ardlui railway station is a remote rural railway station, serving Ardlui at the north end of Loch Lomond, in Scotland. The station is 51 miles (82 km) north of Glasgow Queen Street on the West Highland Line.

Opened to passengers on 7 August 1894 by the West Highland Railway, then run by the North British Railway, it became part of the London and North Eastern Railway during the Grouping of 1923. The station then passed on to the Scottish Region of British Railways on nationalisation in 1948. Due to subsidence the main station building, of the standard 'West Highland' design, had to be demolished around 1970 with an open waiting area built on to the signal box.

When sectorisation was introduced in the 1980s, the station was served by ScotRail until the Privatisation of British Rail.

The station was laid out with a crossing loop and an island platform. There are three sidings on the east side of the station.

On 8 February 1987, the crossing loop was altered to right-hand running. The original Down platform has thus become the Up platform, and vice versa. The change was made in order to simplify shunting at this station, by removing the need to hand-pump the train-operated loop points to access the sidings.


...
Wikipedia

...